Children's home #27 Repair works with total area of 1 500 m².
enlarge ->
|
*** |
 |
 |
„Askon“ Ltd. Finishing works in office building with total area of 1 500 m².
enlarge ->
|
*** |
 |
 |
„Interio“ Trade Complex Finishing works in ground floor of „Interio“ Trade Complex with total area of 6 000 m².
enlarge ->
|
*** |
 |
 |
„Azimuth“ Hotel (former „Sovetskaya“ Hotel) Repairs of rooms in „Azimuth“ Hotel (former „Sovetskaya“ Hotel) with total area of 2 200 m².
enlarge ->
|
*** |
 |
 |
Sports and health improving Complex Olympus (Borovichi town) Carrying-out of finishing jobs in the sports and health improving Complex Olympus (Borovichi town) with total area of 3 000 m².
enlarge ->
|
*** |
 |
 |
Hotel Kievskaya Turnkey repair jobs were performed on one floor of Kievskaya Hotel with total area of 600 m², replacement of heating system risers in the 1st building of the Hotel.
enlarge ->
|
*** |
 |
 |
St. Petersburg State University Capital repairs of the dormitory of the University in Korablestroitelei Str. Repairs of premises for the entertainment and canteen complex of University with an area of 1 500 m².
enlarge ->
|
*** |
 |
 |
Homeowners Association House in Telman Street Repairs of six entrances in dwelling house of HOA House in Telman Street were performed. Repairs of staircases, finishing of the staircase and the hall. Total area is 800 m².
enlarge ->
|
*** |
 |
 |
IPC (Individual Private Company) of Gruzdev D. A. Beauty shop at the address: 75 Grazhdansky Av. Replanning of the premises was carried out, replacement of all the utility systems, arrangement of a separate entrance with a staircase, and finishing was performed.
enlarge ->
|
*** |
 |
 |
Nongovernmental Educational Institution the Russian Christian Humanities Academy
Capital repairs of study rooms on the third floor with an area of 300 m².
enlarge ->
|
*** |
 |
 |
Bereg Ltd. Capital repairs of the foodstore at the address: 19 Sveaborgskaya Str. Replanning of the premises was performed, replacement of windows, doors; power supply, lighting, water supply and ventilation systems were designed and assembled.
enlarge ->
|